Airport Louver Systems – OEM Manufacturer for Terminal Facades

Airport Louver Systems — OEM Manufacturer for Terminal Facades

Runheng is a Chinese OEM manufacturer of architectural louver systems for airport terminals. Since 1995 we have fabricated louvers, curtain wall elements and aluminum systems for airports, data centers and public infrastructure — including one of the world’s busiest airport projects.

Proven at Hong Kong International Airport T2

Runheng’s largest single project is Hong Kong International Airport Terminal 2, where our louvers were specified across the terminal facade. The project is documented by 625 engineering files covering design, fabrication and site coordination — a level of traceability few Chinese manufacturers can match.

  • Products supplied: RS7405 large louvers, RS4405 medium louvers, RS7305A double-blade louvers, TWY420 typhoon-rated louvers
  • Client: Hong Kong Airport Authority
  • Scale: 625 engineering files, our largest single-project archive

Why airports specify Runheng louvers

  • Ventilation & smoke control: louver systems engineered for terminal air-handling and smoke-ventilation openings
  • Typhoon resistance: TWY series (TWY420, TWY630, TWY220) designed for Hong Kong’s typhoon wind loads with structural verification
  • Acoustic performance: RS7305A double-blade louvers used where sound attenuation and airflow must coexist — proven at the West Kowloon Cultural District performance venue
  • Traceability: every batch traceable through our 69,484-file engineering archive (ISO 9001 certified)

RS louver series at a glance

Series Application Typical projects
RS7405 Large louvers, terminal-scale openings Airport T2 (255 documented uses)
RS7305A Double-blade large louvers (flagship) Airport T2, West Kowloon Cultural District, Kai Tak District Cooling
RS4405 Medium louvers, commercial buildings Airport T2, commercial projects
TWY420 Typhoon-rated louver, split-blade Airport T2, Kwai Chung Data Center, Macau Galaxy Hotel

OEM process for airport projects

From shop drawings and VMU samples to fabrication, anodizing/PVDF coating and site coordination — we follow the same process that satisfied Hong Kong Airport Authority: design review → shop drawings → sample (VMU) → batch fabrication → QC → delivery. Hong Kong quality standards (British Standards materials) apply to every export order.

Request a quotation for your airport louver project → We reply within 24 hours with pricing and technical evaluation.